Tuesday, March 13, 2007

E2 (Endurance)

So Far So Good
Tuesdays workout went really well. My legs felt good and my heart rate stayed low considering the power output. Before the workout I made the decision to switch Tuesdays P2 (hill sprints) to a 2 hour E2 (Endurance) workout, which was scheduled for Wednesday. I wasn't able to ride outside on Tuesday because the bike was still set up for the trainer and sprints are somewhat difficult to do inside. During the warm-up the legs felt good and the HR was lower than it has been. During the ride I was able to maintain speeds a little over 19 mph (230 watts). The workout finished strong and the stats are listed below.

Time: 2.0 hours
Ave Speed: 19.0 mph (235 watts)
AVe HR: 158 bpm

Sunday, March 11, 2007

E2 (Endurance)

I decided to take a break
I woke up early Sunday morning (something I hate to do) to get on the bike for a relatively easy but long endurance ride. My body was not liking the fact that it received 1 hour less sleep due to daylight savings time. I grabbed a few things to eat quickly and a stash of food for the ride and headed downstairs. During the warm-up I kept asking myself if this was beneficial to my training or would I be better off going back to sleep. The legs felt good and as I continued to push to a higher speeds my heart rate remained fairly low (similar to past efforts). After about 10 minutes I made the decision to stop the ride and go back to bed.

In general the training has been disjointed since the race in Tucson and trip (not unexpected). This week is the second week of build 1 with nearly 9 weeks before the start of the race season. The primary goal now is to get the training back on track, which I don't think will be a problem. The weather is getting warmer and the snow is quickly melting. Andrea and I will need to make changes in our schedule to start riding outdoors.

Saturday, March 10, 2007

A1 (Anearobic VO2 Max Intervals)

First Round of Anearobic Intervals

Lets just say that it's much easier said (written) than done. I had originally planned on performing four 4 minute intervals with an equal rest time between. The intervals would take about 1 hour and the remaining 1.5 hours would be filled with an E2 (18 mph) ride. Based on previous testing I figured that the intensity for the intervals should be somewhere between 23 and 24 mph (360 - 400 watts). Even before the ride I had revised the plan so the intervals were done at 23 and not 24 to be on the conservative side.

During the warm-up the legs felt good, but my heart rate seemed abmormally high for the low effort. During the lead-in E2 part of the warm-up my HR was at least 10 bpm higher than normal. It probably had something to do with eating just before the workout; it have made a mental note. The first inteval started well and I was able to hit the desired speed and started to get settled in to a rythem, but at about 1.5 minutes I was laboring to hold the speed. I decided to go 2 minutes on the first interval and recover for 2 minutes, hoping it was a result of an insufficient warm-up. The second interal went about as good as the first, but this time I allowed a 3 minute recovery to hopefully be ready for a 3 minute interval. I was only able to go 2 minutes on the third interval as well and decided to finish off the intervals with one more 2 minute interval.

The remainer of the ride went really well I was able to hold 18 mph easily, although my HR was still above what it normally is for that intensity.

In the future I will need to make sure I am both physically and mentally ready for the intensity of these workouts. These efforts are fairly painful (if done correctly), but in my opinion the most critical to developing race specific skills.

Thursday, March 8, 2007

M2 (Cruize Intervals)

Getting into the Build Phase
Last night was the first time this traing season performing cruize intervals. Overall they went quite well, but were slightly more intense than previous training. The duration was supposed to be 2 hours but mentally I was only able to manage 1.5 hours. The intervals were structures as follows.

Schedule
0 - 10 min warm up (13 -> 18 mph)
0:10 - 0:20 E2 warm up (18 mph, 210 Watts)
0:20 - 0:28 Interval #1 (21 mph, 290 Watts)
0:28 - 0:31 Recovery (13 - 14 mph, 120 Watts)
0:31 - 0:39 Interval #2 (21 mph, 290 Watts)
0:39 - 0:42 Recovery (13 - 14 mph, 120 Watts)
0:42 - 0:50 Interval #3 (21 mph, 290 Watts)
0:50 - 0:53 Recovery (13 - 14 mph, 120 Watts)
0:53 - 1:01 Interval #4 (21 mph, 290 Watts)
1:01 - 1:04 Recovery (13 - 14 mph, 120 Watts)
1:04 - 1:12 Interval #5 (21 mph, 290 Watts)
1:12 - 1:30 E2 (18 mph, 210 Watts)

The first interval went well, however, it took my legs the entire duration of the interval to adapt to the intensity. The second and Third intervals were good, but by the fourth interval the legs were starting to slow slightly. I was able to push through the final interval, but the legs were feeling really tired. The original plan called for a 2 hour ride, but I stopped short because I felt I wasn't getting any physical benefit and mentally I was drained from all the rides on the trainer. I can't wait for the snow to melt and the weather to turn warm. Also, I think I am spoiled from the rides down in Arizona, it was SO much fun!

This weekend should be challenging. I have to find a way to fit in a 2.5 hour ride on Saturday and a 3.5 hour ride on Sunday, while at the in laws for a baby shower. I will see how it goes, but I might cut these rides a little short.

Note: This workout was performed on a Kurt Kinetic trainer and recorded with a Polar S-720i HR monitor. The data was downloaded and evaluated for HR and power based on an established speed vs power relationship.

Sunday, March 4, 2007

Scaleing Back the Training

I have made the decision to scale back my training volume from 600 hours annually to 500 hours annually starting the week of March 4th. I have found it increasingly difficult to complete the longer endurance workouts primarily due to boredome. Although I find it much easier than most people to spend endless hours on the indoor trainer, the 4 hour rides seem to take an eternity. Do to this boredome and subsequent lack of motivation I feel the quality of my training rides are suffering. Therefore, by changing the annual hours from 600 to 500 makes my longest endurance rides typically 3 hours. Possibly after the snow melts and I am able to ride outside I will push a few longer enduranc rides.

Tuesday, November 7, 2006

Training Kickoff for 2007 Race Season

The training will offically start November 20th 2006 and continue through the 2007 race season. The vast majority of the training is based on the popular book by Joe Friel "The MTB Training Bible". The basic method of periodization is applied to build more race specific skills as the training progresses. The major ideal that I am trying to hold is to do the least amount of work to achieve the desired result. What that basically means is that more is not always better and there is diminishing returns to the time put into training.

Friday, October 20, 2006

Terminology

Heart Rate Zones

E1: ACTIVE RECOVERY:
Heart Rate: (Z1)
Duration: 15-60 minutes
Period(s): All Periods
Description:

E2: ENDURANCE:
Heart Rate: (Z2)
Duration: 1-4 hours
Period(s): All Periods
Description: Stay seated on uphills, high norm cadance.

F1: HILLY ENDURANCE:
Heart Rate: (Z4/5a)
Duration: several minutes each
Total Time:
Period(s): All Periods
Description: Several minute climbs, 60 rpm

F2: BIG GEAR CLIMBS: -
Heart Rate: (Z5a/5b)
Duration: 1-2 minuets each
Total Time: 6-30 min
Cadence: 50-60 rmp
Periods:
Description: Perform steep 1-2m climbs at low cadence

S1: SPIN UPS:
Hear rate: (Z/NA)
Periods: All Non Build
Description: Performed downhill or tailwind or on trainer with lighter resistance, gradual increase of rpm over 30 sec to max w/o bounce.

S2: ISOLATED LEG:
Hear rate: (Z/NA)
Periods: All Non-Build
Description:

S3: FIXED GEAR: - (Z2-Z3) - road bike, 90 rpm or higher, flat no wind, E,F,S, all non-build

S4: FORM SPRINTS: - (Zna) - 6-10 sprints of 10 seconds, normal sprint gear, focus on form, do alone, Bs2- Bs3

S5: OFF ROAD HANDLE: - (lowZ or low power) – work on skills in park then trail, Bs1-Bs2- Bs3

M1: TEMPO: - (Z3) - flat road, 20-60min, avoid traffic stop areas, stay aerodynamic body, Bs2- Bs3

M2: CRIUSE INTERVALS: - (Z4-Z5a) - flat, 3-5 ints 6-12m ea. (start 4x6), TT rpm, 2-3m recover easy, listen2body, Bs3, B1, B2, P, R

M3: HILL CRIUSE INTERVALS: - (Z4-Z5a) - “do 2-3 M2 first………TT rpm or lower” listen2body, Bs3, B1, B2, P, R

M4: CRISS-CROSS THRESHOLD: - (lowZ4 to highZ5a) – ride 20-40m alt btwn zones every 3-5m, TT/aero, B2, P

M5: THRESHOLD: - (Z4-Z5a) - 20-40m TT, listen2body, relax, aero, monitor rpe, do3x M2’s before attempt, B2, P

M6: SHIFTING CRIUSE INTERVALS: - (z4z5a 60sec then z5b 30sec) cruise int. but shift btwn gears. TT rpm, max 30min tl., B2, P, R

A1: ANAEROBIC ENDURANCE INTERVALS: - (Z5b) – flat no stops, 4-6 ints 5min ea., high rpm race like, ease spin recover, B1, B2, P, R

A2: PYRAMID INTERVALS: - (z5b) – A1 but 1,2,3,4,5,4,3,2,1 min. long, recover equal to previous/easy spin, flat road, B1, B2, P, R

A3: HILL INTERVALS: - (5b) – steep off-road hill 3-5min., 4to6 climbs, seated, higher than norm rpm, spin down easy, 9-18mT, “ “ “ “ “

A4: LACTATE TOLERANCE REPEATS: - (Zna) –starts, slight uphill or wind, high pow accel, 3-5sets 30/40 sec. rpm+, 6m max, later12m, 48hrs, 1/2wk max, B2, P

A5: LONG HILL REPEATS: - (60 sec. Z5b sit then 30 sec. Z5c stand), sit Z5b then shift to higher gear stand to Z5c, all high rpm, B2, P

A6: RACE SIMULATION: - (Zna…race relevant) race with friends, if fresh employ race tactics, B2, P, R

A7: TIME TRAIL: - (Zna...A race relevant) terrain and conditions like race, 10-20minute loop, do 40min, recover 5/10m, B2, P, R

P1: JUMPS: - (Zna) 3-5 sets of 5 jumps, 15-25 tl., explosive power frm 1st stroke, 10-12 rpm each leg, stand, high rpm, B1, B2, P, R

P2: HILL SPRINTS: - (Zna) on or off road hill, 8-12 sprints, 8-10 sec., flying start, power into, stand through, 5min recover, B1, B2, P, R

P3: CRIT SPRINTS: - (Zna) short loop off road, tight corners, 6-9 sprints, 25-35 sec., incl 1 or more corners, 5m spin recover, B2, P, R